论文格式:申请同济大学公共管理硕士(2)

时间:2021-04-19 10:04:41 论文格式 我要投稿

论文格式范例:申请同济大学公共管理硕士


由此,针对BT模式在我国目前运用中存在的问题,提出了“BT融资代建制”模式的制度设计
……
最后通过对上海外环隧道项目资金信托计划设计以及上海地铁一号线南站站改建工程、重庆菜园坝长江大桥几个BT项目的案例进行实证分析,说明BT模式的优势、实践中的不足之处,并提出相关建议。

关键词:公共基础设施, BT模式, 融资
 
ABSTRACT
Public infrastructure facilities is the foundation of national economy. Entering 21 century ,with entering WTO, China becomes more international, national economy remains developing rapidly. The level of urbanization raises continually. The bottleneck action of public infrastructure facilities to economic development is outstanding day by day . So, it is a pressing matter of the moment to strengthen the building of public infrastructure facilities.
The paper analyses the present situation that the lack of funds for construction on public infrastructure facilities and the inefficiency of management. It points out that general adoption of the market principle reform must be enforced. Introducing theories of project classification and marketability into it, the paper introduces some management models which are used in different kinds of public infrastructure facilities, including BOT model, project acting build model, BT model. The paper analyses the concept, apply scope, basic characters, significance, financing pattern, process, capital management and so on. Meanwhile, it analysis the problems that exists in the use of MT model in China. It points that BT model is not equal to paying before contract, the model that investor is constructor has both advantages and disadvantages. How to control construction cost and quality of projects? How to invade repurchase risk?
To deal with the outstanding problems existing, The paper puts forward a proposal of BT financing project acting build model on these questions.
……

Finally, the paper gives the cases of asses project of Shanghai external ring tunnel , reconstruction of Shanghai subway Line 1 south station, project of the changjiang river bridge in Chongqing Caiyuan Dam to make a authentic proof  analysis .Showing the superiority of  BT model , deficiency in practice and advice related.


Key Words:  Public infrastructure facilities , BT model ,financing
 
目录
第1章 引言 1
1.1 问题的提出 1
1.2 国内外研究现状 1
第2章 BT项目融资模式的理论基础 2
2.1 我国公共基础设施建设的现状及市场化改革 2

………

2.2 我国公共基础设施项目融资的分类实施 2
2.2.1 公共基础设施项目分类的界定与内涵 2
………

第4章 BT项目融资模式的运作 4
4.1 BT模式的融资方式 4
4.1.2 项目融资方式的运用示例 4
………
第8章 结论与展望 5
8.1 结论 5
8.2 展望 5
致谢 6
参考文献 7
附录A ××××× 8
个人简历  在读期间发表的学术论文与研究成果 9